• vernem01

Ohio River Olmstead lock under construction.

As we turned up the Ohio river, we discovered that the Olmstead lock was under construction. We called the lock and they told us they would send a tug out to lead us passed were the divers were working on one of the new caissons for the lock. Fun to see a lock and dam under construction and we didn't need to end our trip there.


We are currently waiting at Kentucky lock on the Tennessee river and are looking forward to the Land between the Lakes which has many open marinas!


Below, following the tug past the lock under construction, a line boat (big tug) in dry dock with propellers and Steve waiting for chili to finish on the cooktop above the microwave!







78 views0 comments

Recent Posts

See All